Method ScheduleParallelByRef
ScheduleParallelByRef<T>(ref T, int, int, JobHandle)
Schedules a job that will execute the parallel batch job for all arrayLength elements in batches of indicesPerJobCount.
The Execute() method for Job T will be provided the start index and number of elements to safely operate on.
In cases where indicesPerJobCount is not a multiple of arrayLength, the count provided to the Execute method of Job T will be smaller than the indicesPerJobCount specified here.
Declaration
public static JobHandle ScheduleParallelByRef<T>(this ref T jobData, int arrayLength, int indicesPerJobCount, JobHandle dependsOn = default) where T : struct, IJobParallelForBatch
Parameters
| Type | Name | Description |
|---|---|---|
| T | jobData | The job and data to schedule. In this variant, the jobData is passed by reference, which may be necessary for unusually large job structs. |
| int | arrayLength | Total number of elements to consider when batching. |
| int | indicesPerJobCount | Number of elements to consider in a single parallel batch. |
| JobHandle | dependsOn | Dependencies are used to ensure that a job executes on workerthreads after the dependency has completed execution. Making sure that two jobs reading or writing to same data do not run in parallel. |
Returns
| Type | Description |
|---|---|
| JobHandle | JobHandle The handle identifying the scheduled job. Can be used as a dependency for a later job or ensure completion on the main thread. |
Type Parameters
| Name | Description |
|---|---|
| T | Job type |